• Home
  • Completed projects
  • Performed installation in the design position of the columns, weight of 100 tons and a length of 74 meters in the Saratov Oil Refinery, Saratov, Russian Federation

Performed installation in the design position of the columns, weight of 100 tons and a length of 74 meters in the Saratov Oil Refinery, Saratov, Russian Federation

DESCRIPTION:

Performed installation in the design position of the columns, weight of 100 tons and a length of 74 meters in the Saratov Oil Refinery, Saratov, Russian Federation.